Refrigerator water line connection and Refrigerator Relocate
“This price includes only basic labor. Labor may change based on the onsite review.”
Refrigerator water line connection and Refrigerator Relocate $234
Labor Deposit Only $34
Balance $200 paid directly to Service Pro on completion of the project for labor only.
Materials are to be provided by the customer or the cost for materials should be paid directly to the Service Pro upfront.
This includes basic labor for refrigerator water line connection and relocating the old refrigerator downstairs.
– Includes area preparation and protection, setup, and cleanup.
– This does not include dumping. If you need dumping please request.
– Add-On Rate is 75% of the Regular Rate
– The after-Hour Rate is 125% (Appointments Before 9 am or After 7 pm)
– Ask about our Member 5% and Value Rates 10% off your service.
– Need Material acquisition (pick up)? Pay separately $84 at pickup.bookacrewe.com
– Picking up or Purchasing yourself and need measurements? Pay separately $84 at measurements.bookacrewe.com, and we will get you the measurements needed.